
WS-2000XM (2 tons) EDI membrane block
EDI (Electrodeionization) is an advanced technology for producing high-purity and ultra-pure water. It combines electrodialysis and ion exchange, using a DC electric field to remove dissolved salts without the need for chemical regeneration. EDI enables continuous operation, high water quality, and eco-friendly performance — making it a reliable and green solution for ultrapure water production.

모델 | 표준 물 유량(L/H) | 최소(최대) 물 유량(L/H) | 회복률(%) | 농축된 물의 흐름(L/H) | 물 생성 저항(MΩ-cm) | 전력 매개변수 | ||
전류 범위(A) | 권장값(A) | 전압 범위(V) | ||||||
WS-500XM | 500 | 300~750 | 75~85 | 120(100~150) | ≥15 | 1.0~6.0 | 1.2 | 0~55 |
WS-1000XM | 1000 | 800~1500 | 85~95 | 150(100~200) | ≥15 | 1.0~6.0 | 1.5 | 0~135 |
WS-2000XM | 2000 | 1500~2500 | 85~95 | 220(200~400) | ≥15 | 1.5~6.0 | 1.8 | 0~240 |
WS-3000XM | 3000 | 2500~3500 | 85~95 | 330(300~500) | ≥15 | 1.5~6.0 | 2 | 0~320 |
WS-4000XM | 4000 | 3500~4500 | 90~95 | 450(400~600) | ≥15 | 2.0~6.0 | 2.5 | 0~400 |
WS-5000XM | 5000 | 4500~5500 | 90~95 | 550(500~800) | ≥15 | 2.0~6.0 | 2.5 | 0~600 |
모델 | 치수 | 고정 구멍 길이 중심 기둥(mm) | 고정 구멍 너비 중앙 기둥(mm) | 기본 구멍 직경(mm) | 작동 압력 | |||||
L(mm) | W(mm) | H(mm) | 담수 주입구(바) | 담수 배출구(바) | 농축수 주입구(바) | 농축수 배출구(바) | ||||
WS-500XM | 280 | 318 | 605 | 160 | 215 | 10 | 2.0(1.5~3.0) | 1.0(1.0~1.5) | 0.6(0.5~1.0) | 0(0~0.5) |
WS-1000XM | 370 | 318 | 605 | 235 | 215 | 10 | 2.0(1.5~3.0) | 1.0(1.0~1.5) | 0.6(0.5~1.0) | 0(0~0.5) |
WS-2000XM | 535 | 318 | 605 | 385 | 215 | 10 | 2.2(1.5~3.0) | 1.0(1.0~1.5) | 0.6(0.5~1.0) | 0(0~0.5) |
WS-3000XM | 695 | 318 | 605 | 535 | 215 | 10 | 2.3(2.0~3.5) | 1.0(1.0~1.5) | 0.6(0.5~1.0) | 0(0~0.5) |
WS-4000XM | 860 | 318 | 605 | 685 | 215 | 10 | 2.5(2.0~3.5) | 1.0(1.0~1.5) | 0.8(0.5~1.0) | 0(0~0.5) |
WS-5000XM | 925 | 318 | 605 | 755 | 215 | 10 | 2.5(2.0~4.0) | 1.0(1.0~1.5) | 0.8(0.5~1.0) | 0(0~0.5) |

Remark: The operating pressure and voltage vary with the inlet water quality, temperature, use time, etc. (The manual measurement of the membrane block size has errors, the actual size shall prevail.)
Note:
1. During operation, water should be turned on first and then power on;
2. The concentrated water outlet should be protected by limit;
3. Pressure setting principle: fresh water inlet > fresh water outlet > concentrated water inlet > concentrated water outlet.
Packing:




Get in touch with us
Our team will be happy to respond to you in less than 24 hours.
